Unlocking Heterogeneous Accelerator Flexibility in AI Data Centers: Sizing and Workload Allocation
Read the original on arXiv AI →The Flow has not summarised this story yet — read it at arXiv AI.
The Flow has not summarised this story yet — read it at arXiv AI.
The paper proposes a solver‑free online scheduling rule for AI data center tasks that assigns start periods upon task arrival to minimize energy cost while respecting operational constraints. By shifting flexible tasks to low‑price periods and keeping high‑priority tasks on schedule, the rule keeps GPU and CPU usage within capacity. Simulations on an A100 GPU trace show lower cost and significantly reduced computation time compared to a multi‑timescale optimization benchmark.
The paper introduces the Power Flexibility Index (PFI) to measure how large language model (LLM) training performance changes when GPU power is reduced. Using 131 training runs on H200 and H100 GPUs, the study finds that LLM jobs have significant but variable power elasticity and identifies telemetry signals that can predict PFI during runtime. The authors demonstrate that allocating power based on PFI maximizes overall token throughput, recovering about 1.5k tokens/s per job under a 30% power reduction, which represents 63% of the gap between equal-weight and perfect-information allocations.
The paper introduces PWR, a scheduling policy that selects power‑efficient GPU and CPU combinations to reduce power consumption in GPU datacenters. It complements the existing Fragmentation Gradient Descent (FGD) policy, which mitigates GPU fragmentation by using a fragmentation metric. Experiments in a simulated cluster show that combining PWR with FGD balances power savings and fragmentation reduction.
The study compares grid‑connected and off‑grid energy options for AI data centers across the continental U.S., evaluating AC‑ and DC‑coupled solar‑plus‑storage, islanded natural gas, and grid interconnection. Using a technoeconomic framework that incorporates AI training loads, climate‑driven cooling, power conversion stages, and battery degradation, the authors introduce a speed‑adjusted cost of energy that accounts for compute unlocked by faster deployment. They find that DC coupling cuts lifetime energy costs by 18% versus AC, and when deployment speed is valued, DC‑coupled microgrids become the lowest‑cost option in 85% of locations, indicating that deployment speed outweighs unit energy cost for AI infrastructure.
arXiv:2607. 26710v1 Announce Type: new Abstract: The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling.
The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load.