The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load.
The paper introduces PowerAtlas, a language model designed for electricity‑computing co‑scheduling (ECCS), which determines where and when computing tasks run alongside generator dispatch. It formalizes ECCS as a structured decision task, releases a benchmark dataset ECBench with 2,000 instances and optimal schedules, and trains PowerAtlas using supervised initialization and Feasibility‑Aware GRPO to produce joint schedules without solver calls. Experiments show that PowerAtlas reduces constraint violations by 89‑98% and cost penalties up to 26× compared to baseline models.
By Kaiwen Jiang, Siya Xu, Ziyue Zhu, Kaiwen Xue, Chao Yang, Anh Tuan Luu, Haoran Luo
arXiv:2607. 18147v1 Announce Type: cross Abstract: Large language models (LLMs) and agentic AI systems have evolved from natural language tasks to using external tools to plan, retrieve, and act in technical domains.
By Daniela Rojas, Abdulwahab Albassam, Aidan G. Leung, Jett Ngo, Ryan Luo, Peter R. Quawas, Junpyung Kim, Kangkai Liang, Mansi Nanavati, Jonathan Mai, Meng-Chi Tsai, Yun-Tong Tsai, Yize Chen, Yuanyuan Shi
arXiv:2605. 23348v2 Announce Type: replace-cross Abstract: AI power demand is growing at an unprecedented rate while power grids are often ailing and struggle to keep up.
By Tella Rajashekhar Reddy, Atharva Deshmukh, Liangcheng Yu, Chaojie Zhang, Mike Shepperd, Rohan Gandhi, Anjaly Parayil, Srinivasan Iyengar, Ajay Manchepalli, Debopam Bhattacherjee
The study compares grid‑connected and off‑grid energy options for AI data centers across the continental U.S., evaluating AC‑ and DC‑coupled solar‑plus‑storage, islanded natural gas, and grid interconnection. Using a technoeconomic framework that incorporates AI training loads, climate‑driven cooling, power conversion stages, and battery degradation, the authors introduce a speed‑adjusted cost of energy that accounts for compute unlocked by faster deployment. They find that DC coupling cuts lifetime energy costs by 18% versus AC, and when deployment speed is valued, DC‑coupled microgrids become the lowest‑cost option in 85% of locations, indicating that deployment speed outweighs unit energy cost for AI infrastructure.
By Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras
The paper presents an LLM-based predictive scheduling system that forecasts execution time and energy consumption from source code, aiming to improve data center sustainability. By integrating these predictions into a real-time GPU allocation algorithm, the system reduces both energy use and queuing delays. In a collaboration with a data center, the approach achieved a 32% drop in energy consumption and a 30% reduction in waiting time.
By Hanzhao Wang, Jingxuan Wu, Yumeng Li, Yu Pan, Guanting Chen