arXiv AI

Solver-Free and Cost-Aware Online Scheduling of AI Data Center Tasks

The paper proposes a solver‑free online scheduling rule for AI data center tasks that assigns start periods upon task arrival to minimize energy cost while respecting operational constraints. By shifting flexible tasks to low‑price periods and keeping high‑priority tasks on schedule, the rule keeps GPU and CPU usage within capacity. Simulations on an A100 GPU trace show lower cost and significantly reduced computation time compared to a multi‑timescale optimization benchmark.

arXiv AI
Oct 26

Power- and Fragmentation-aware Online Scheduling for GPU Datacenters

The paper introduces PWR, a scheduling policy that selects power‑efficient GPU and CPU combinations to reduce power consumption in GPU datacenters. It complements the existing Fragmentation Gradient Descent (FGD) policy, which mitigates GPU fragmentation by using a fragmentation metric. Experiments in a simulated cluster show that combining PWR with FGD balances power savings and fragmentation reduction.

By Francesco Lettich, Emanuele Carlini, Franco Maria Nardini, Raffaele Perego, Salvatore Trani
arXiv Machine Learning
Aug 20

LLM-Powered Predictive Decision-Making for Sustainable Data Center Operations

The paper presents an LLM-based predictive scheduling system that forecasts execution time and energy consumption from source code, aiming to improve data center sustainability. By integrating these predictions into a real-time GPU allocation algorithm, the system reduces both energy use and queuing delays. In a collaboration with a data center, the approach achieved a 32% drop in energy consumption and a 30% reduction in waiting time.

By Hanzhao Wang, Jingxuan Wu, Yumeng Li, Yu Pan, Guanting Chen
arXiv Machine Learning
Oct 5

AI-driven Thermal-aware Data Center Capacity Planning

The paper introduces an AI-driven framework for thermal‑aware capacity planning in data centers, enabling temperature predictions in milliseconds by learning from key parameters such as rack power, server placement, and HVAC settings. The model is validated against high‑fidelity CFD simulations and achieves a 10,000‑fold speedup while maintaining high accuracy for unseen designs. This rapid prediction capability allows designers and operators to instantly optimize workload distribution and cooling efficiency.

By Yixing Li, Mark Fenton, Matthew Kaufeler, Ka Ming Leung, Xin Ai, Zhiyu Zeng
Hugging Face Trending Papers
Jul 29

PowerAtlas: Towards Electricity-Computing Co-Scheduling for Power Systems

The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load.

arXiv AI
Jun 16

The Energy Blind Spot: NVIDIA's Flagship Edge AI Hardware Cannot Support Process-Level Energy Attribution

arXiv:2605. 27599v2 Announce Type: replace-cross Abstract: Agentic AI workloads - where a single user goal triggers multi-step orchestration, tool calls, retries, and failure recovery - are being targeted for edge deployment, with NVIDIA, Dell, HP, ASUS, MSI, Acer, and Gigabyte all shipping GB10-based desktop AI systems in 2026.

By Deepak Panigrahy, Aakash Tyagi