The paper investigates failures in large language model (LLM) safety systems where runtime monitors detect policy‑relevant evidence but the evidence never reaches the enforcement decision point. Using canary contracts, the authors identified 18 evidence‑path failures across 11 safety projects and four ecosystems, categorizing them into established‑boundary repairs, new‑surface policy gaps, and boundary‑only evidence cases. The study demonstrates that ordinary application behavior can continue while safety‑specific evidence is lost, highlighting the need for regression tests on evolving monitor schemas, streams, tools, and adapters.
By Junchi Liao
arXiv:2607. 23386v1 Announce Type: new Abstract: We document a failure class in frontier large language models -- exception chain collapse -- observed in eligibility evaluation under nested conditional rules of the form "A is required UNLESS B applies, UNLESS C overrides B".
By Paul Simpson, John Kozak, Lisa Doake
arXiv:2608. 11274v1 Announce Type: cross Abstract: The dominant paradigm treats AI safety as a property to be instilled during model training via RLHF, DPO, or Constitutional AI.
By Albus W. Ng, Yi Han, Jusheng Zhang, Wenhao Wang
arXiv:2606. 30219v1 Announce Type: new Abstract: LLM evaluation and AI safety face a shared measurement problem: benchmark scores, reward-model signals, and reported safety metrics can improve while the latent properties they are meant to represent remain difficult to verify.
By Bu\u{g}ra Alperen Ulu{\i}rmak, Rifat Kurban
arXiv:2607. 12469v1 Announce Type: cross Abstract: Many agent-safety evaluation results are not yet load-bearing evidence: identical nominal outcomes (task success, attack success, monitor scores) may sit atop materially different evidence regimes.
By Oleg Solozobov
The paper introduces Runtime Assurance Contracts (RAC) as a formal policy framework for high‑risk AI agents, addressing the "assurance‑transition gap" by binding autonomy boundaries, component eligibility, evidence state, transition policy, human‑review capacity, and non‑compensatory gates. RAC allows soft metrics to influence routing while mandating retries, switches, escalations, deferrals, or stops when mandatory gates fail or are unknown, ensuring aggregate performance cannot alone authorize action. The authors define the contract, evidence record, permission rule, and five invariants, and evaluate RAC through deterministic failure‑injection studies, hand‑authored traces, and a prospective synthetic holdout, comparing it to score‑only and restricted protocol baselines.
By Serhii Zabolotnii