Planning or Learning: Reliability and Cost in Multi-Asset Maintenance
Read the original on arXiv AI →The Flow has not summarised this story yet — read it at arXiv AI.
The Flow has not summarised this story yet — read it at arXiv AI.
The paper introduces Safe Contrastive Reinforcement Learning (Safe-CRL), a method that corrects bias in contrastive RL caused by failure-terminated Markov decision processes. By applying mass-weighted InfoNCE and a log-survival-mass score, Safe-CRL uses only a one-bit failure signal to improve survival and goal-reaching performance across twelve robot navigation and locomotion tasks. The approach demonstrates complex failure-avoidance behaviors and completes the theoretical foundation of contrastive RL under failure termination.
The paper introduces Potential-Guided Policy Optimization (PGPO), a method for multi-turn agentic tasks that improves credit assignment by estimating empirical state potentials from anchor-state-group return statistics. PGPO derives action advantages from potential differences between adjacent states, enabling cross-trajectory credit propagation and finer-grained step-level credit assignment, especially within failed trajectories. Experiments on ALFWorld and WebShop demonstrate strong performance compared to recent group-based reinforcement learning methods, with negligible training overhead.
arXiv:2605.17036v4 Announce Type: replace-cross Abstract: This paper studies the performance and reliability of autonomous generative AI agents in multi-echelon supply chains using the MIT Beer Game....
arXiv:2407. 15283v2 Announce Type: replace-cross Abstract: Industry is moving toward autonomous, network-connected machines that detect and adapt to changing conditions, including hardware faults.
arXiv:2606. 18820v1 Announce Type: cross Abstract: Sequential decision problems often exhibit an asymmetric evolution of information and decision flexibility: as a decision cycle unfolds, the agent receives richer information while feasible actions expire due to operational cutoffs, commitments, or resource constraints.
arXiv:2608. 14122v1 Announce Type: new Abstract: Production scheduling in complex manufacturing environments is challenging when sequence-dependent setup times, stochastic disturbances, and due-date constraints must be addressed simultaneously.