Finding Optimal Cost-Bounded Plan Reductions: Refined Model

Read the original on arXiv AI →

arXiv:2607. 25484v1 Announce Type: new Abstract: In some real applications a plan may later become unfeasible due to newly imposed budget constraints, yet, at the same time, using only the original actions of the plan and their order is mandatory.

Machine-generated by The Flow from the publisher's headline and feed description — not written or checked by a human. The full article lives at arXiv AI.

arXiv AI
Sep 4

Lose the Order, Keep the Hierarchy: Deordering HTN Plans

The paper "Lose the Order, Keep the Hierarchy: Deordering HTN Plans" adapts two classical plan deordering techniques to the Hierarchical Task Network (HTN) planning framework, extending them to respect hierarchical decomposition constraints. The authors evaluate their methods on the IPC 2023 Partial-Order HTN benchmarks and compare them with Optiplan, an HTN planner that generates partially ordered plans directly. Results show a substantial reduction in ordering constraints, with a smaller but noticeable decrease in critical path length.

By Takudzwa Togarepi, Gaspard Quenard, Damien Pellier, Humbert Fiorino
arXiv AI
Jul 7

Resource-constrained Project Scheduling with Time-of-Use Energy Tariffs and Machine States: A Logic-based Benders Decomposition Approach

arXiv:2601. 06542v2 Announce Type: replace-cross Abstract: In this paper, we investigate the Resource-Constrained Project Scheduling Problem (RCPSP) with Time-of-Use (TOU) energy tariffs and machine states, a variant of RCPSP for production scheduling, where energy price is part of the criteria and one highly energy-demanding machine can be in one of the following three states: proc, idle, or off.

By Corentin Juvigny, Anton\'in Nov\'ak, Jan Mand\'ik, Zden\v{e}k Hanz\'alek