arXiv:2603. 23249v2 Announce Type: replace-cross Abstract: Efficient scheduling of directed acyclic graphs (DAGs) is a core problem in large-scale data-intensive computing systems, where query plans, data-processing workloads, and computation graphs consist of dependent tasks competing for limited heterogeneous resource pools.
By Ruisong Zhou, Haijun Zou, Li Zhou, Chumin Sun, Zaiwen Wen
arXiv:2604. 23841v2 Announce Type: replace-cross Abstract: Efficiently solving the Job Shop Scheduling Problem in real-world industrial applications requires policies that are both computationally lean and topologically robust.
By Jonathan Hoss, Moritz Link, Noah Klarmann
arXiv:2602. 18109v3 Announce Type: replace Abstract: Real-time schedulers must reason about tight deadlines under strict compute budgets.
By Rong Fu, Yibo Meng, Zeyu Zhang, Ziming Guo, Jia Yee Tan, Xiaojing Du, Simon James Fong
arXiv:2607. 11725v1 Announce Type: cross Abstract: Prefabricated prefinished volumetric construction moves most building work into module factories, whose production floor operates as a flexible job shop.
By Ziheng Zhang, Wei Zhang
arXiv:2608. 14122v1 Announce Type: new Abstract: Production scheduling in complex manufacturing environments is challenging when sequence-dependent setup times, stochastic disturbances, and due-date constraints must be addressed simultaneously.
By Arne Kr\"oger, Ralf Buscherm\"ohle, Wilhelm Hasselbring, Henrik Wilbers
arXiv:2607. 02941v1 Announce Type: new Abstract: Multi-product kitting delivery imposes significant challenges for real-time scheduling in hybrid manufacturing systems that integrate processing and assembly, as dynamic order arrivals simultaneously alter supply dependencies and the set of feasible job-machine assignments.
By Junhao Qiu, Jianjun Liu, Ting Liu, Rongjie Liao, Zhantao Li, Qingfu Zhang