BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport
Read the original on arXiv Machine Learning →The Flow has not summarised this story yet — read it at arXiv Machine Learning.
The Flow has not summarised this story yet — read it at arXiv Machine Learning.
arXiv:2607. 11725v1 Announce Type: cross Abstract: Prefabricated prefinished volumetric construction moves most building work into module factories, whose production floor operates as a flexible job shop.
arXiv:2610. 21001v1 Announce Type: new Abstract: Column generation folklore warns that initial columns hurt: a warm start may bias the dual and slow the root of branch-price-and-cut.
arXiv:2607. 16891v1 Announce Type: cross Abstract: A truckload carrier must accept or reject each load tender within seconds.
arXiv:2604. 24117v2 Announce Type: replace Abstract: Efficient job-shop scheduling with transportation resources is critical for high-performance manufacturing.
arXiv:2606. 13682v1 Announce Type: new Abstract: The open shop scheduling problem (OSSP) arises in many industrial and service settings but remains computationally challenging as the number of jobs and machines increases.
arXiv:2607. 07343v1 Announce Type: cross Abstract: Online truckload bid acceptance is a closed-loop stochastic decision problem in which a carrier or broker must, in real time, accept or reject a tendered load subject to operational feasibility, fleet repositioning costs, and opportunity cost against future demand.