arXiv:2606. 09617v1 Announce Type: cross Abstract: The rapid expansion of AI globally has led to the proliferation of energy-intensive hyperscale data centres (DCs), making them as a structurally challenging component in power system planning and operation.
By Mohammad Hemmati, Gbemi Oluleye, Vassilis M. Charitopoulos
arXiv:2608. 12915v1 Announce Type: cross Abstract: The rapid growth of LLM inference is shifting sustainability concerns from one-time training to continuous serving, where infrastructure decisions shape energy use, carbon emissions, water consumption, and service quality.
By Nicoletta Tsiopani, Moysis Symeonides, George Pallis, Marios D. Dikaiakos
arXiv:2606. 00811v1 Announce Type: cross Abstract: Data centers now account for 4.
By Dana Golden, Aruna Balasubramanian, Niranjan Balasubramanian
arXiv:2605. 23348v2 Announce Type: replace-cross Abstract: AI power demand is growing at an unprecedented rate while power grids are often ailing and struggle to keep up.
By Tella Rajashekhar Reddy, Atharva Deshmukh, Liangcheng Yu, Chaojie Zhang, Mike Shepperd, Rohan Gandhi, Anjaly Parayil, Srinivasan Iyengar, Ajay Manchepalli, Debopam Bhattacherjee
arXiv:2607. 26710v1 Announce Type: new Abstract: The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling.
By Kaiwen Jiang, Siya Xu, Ziyue Zhu, Chao Yang, Anh Tuan Luu, Haoran Luo
The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load.